Sign In | Join Free | My lightneasy.org
China Guangdong Shineplus Connection Technology Co.,LTD logo
Guangdong Shineplus Connection Technology Co.,LTD
Professional, Integrity, Green & Win-win
Verified Supplier

1 Years

Home > EV Charging Cable >

Custom Bare Copper Stranded EV Charging Cable With EVI-2 Insulation / EVM-1 Jacket

Guangdong Shineplus Connection Technology Co.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Custom Bare Copper Stranded EV Charging Cable With EVI-2 Insulation / EVM-1 Jacket

  • 1
  • 2

MOQ : 1000m

Price : To be negotiated

Insulation : EVI-2

Packaging Details : Packed in rolls or reels

Packing : Packed In Reels

Temperature : -40-90℃

Certification : RoHS

Supply Ability : 100km per day

SP : 2500226

Payment Terms : T/T,L/C,Western Union

Brand Name : Shineplus

Voltage : 450/750V AC

Name : EV Charging Cable

Conductor : Bare Copper Stranded

Delivery Time : 3-4 Weeks

Place of Origin : China

Jacket : EVM-1

Model Number : Customize

Application : EV Charging Cable

Contact Now

Custom Bare Copper Stranded EV Charging Cable with EVI-2 Insulation and EVM-1 Jacket for Electric Vehicles

Construction
A:5C×4mm2 B:1C×0.5mm2
Conductor Bare copper stranded
Cross section 4mm2 0.50mm2
Construction 210/0.15mm+Tinsel+ Kevlar 28/0.15mm+Tinsel+ Kevlar
Strand Dia.(Ref.) 2.70mm 1.15mm
Insulation EVI-2
Nom.Thickness 0.70mm 0.40mm
Min.Thickness 0.53mm 0.30mm
Insulation Dia. 4.30±0.25mm 2.00±0.10mm
Insulation colour A1.brown A2.blue A3.black A4.gray A5.yellow/green B1.black
Filler PP rope
Tape Non woven
Assembly 5C×4mm2+1C×0.5mm2+W
Jacket EVM-1
Nom.Thickness 1.30mm
Min.Thickness 1.04mm
Outer Dia. 15.40±0.50mm
Colour per request

Product Description
Application:EV Charging
Product character:
Tensile strength:≥20MPa Elongation:≥300%
Aged condition:110±1℃×168h
Percent of original tensile strength:±30%
Percent of original elongation: ±30%

Insulation:EVI-2
Conductor : Bare copper stranded
Construction
Insulation: A1.brown A2.blue A3.black A4.gray A5.yellow/green B1.black
Jacket Color : per request

Technical data
Rated voltage:450/750V AC
Rated Temperature: -40-90℃
Max.conductor DC resistance(20℃):A:4.95Ω/km B:39Ω/km
Dielectric Strength AC:2.5kV/5min

Properties
Effectively resist electromaganetic interference
Excellent insulation performance
Extensively Flame resistant
Flexible

Custom Bare Copper Stranded EV Charging Cable With EVI-2 Insulation / EVM-1 Jacket


Product Tags:

Custom EV Charging Cable

      

Copper Stranded EV Charging Cable

      

EVM-1 Jacket EV Charging Cable

      
Buy cheap Custom Bare Copper Stranded EV Charging Cable With EVI-2 Insulation / EVM-1 Jacket product

Custom Bare Copper Stranded EV Charging Cable With EVI-2 Insulation / EVM-1 Jacket Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangdong Shineplus Connection Technology Co.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)